Have you ever noticed that the fruit and nuts in your breakfast muesli tend to stay at the top of the packet? So that when you are getting toward the end of the packet, you are usually left with mostly the boring bits?
There is a simple explanation. When there are many large lumps (the fruit and nuts) together, they have large holes in between them, and smaller lumps (the oats) can fall through the holes. When many small lumps are together, they have small holes in between them, so large lumps can’t fall through. Consequently, with gentle shaking there is a tendency for the large and small lumps to separate, with the large lumps at the top.
Interesting, but so what? Well, perhaps the same sort of thing happens with the order of work activities. The interesting, strategic lumps stay at the top and get done first. The boring – or difficult – bits may fall through the cracks, or at least get left to others or to later. The trouble is that to have a nutritionally balanced diet, we need the whole mixture, not just the exciting bits. Good delivery requires us to stick to doing things in the best order, even when that means tackling early some activities we would rather leave till later.
Is your high-level strategy adequately joined up with the realisation of the vision on the ground?
The people who are interested in the strategy are often not very interested in managing the details, and perhaps are frustrated by the questions they are asked by implementers.
The people who are delegated the task of dealing with the detail frequently do not have the strategic ability, or lack the information, to understand fully the context for what they have been asked to do.
The consequence is a gap between intent and delivery which is often filled with misunderstandings, confusion, misalignment and ultimately frustration.
A joined-up strategy
Overcoming this requires a clear shared understanding of the big picture. It is not just about communications, although that is important. As they say, the devil is in the detail, so it requires working together to think through the implications of strategy – the roles cannot be separated. Both the big picture and the detail matter, but how you join them up is critical: the whole can be greater than the sum of the parts, but only if it really is a whole.Yesterday I spent the morning at WBMS, in a fascinating workshop run by Quirk Solutions exploring the value of ‘Wargaming’ as a way of testing the resilience of a strategy and related plans before putting them into effect.
Wargaming, as you might imagine, is based on the process developed by the military to evaluate their plans, but that is where any direct connection to anything military ends. If you called the process something else, nothing about it would tell you its origins. And in practice, it is really a somewhat more formalised and disciplined extension of testing approaches which you may well already use to some extent. Where Chis Paton and his team at Quirk really add value is in their in-depth experience of what works, and highly-polished skills for facilitating the process to make it maximally effective.
I took away a number of key ideas for running a good process which I thought it would be worth sharing.
Wargaming
The process is based around two teams: the Blue (plan-owning) Team and the Red (plan-challenging) Team. Although that sounds similar to the common approach of ‘Red Team Review’ for proposal improvement, in this process it is made more effective by asking each Red Team player to represent the views of a major interested party or parties. This makes for a much more engaged and lively process, better bringing out emotive issues. It can also bring out the important potential conflicts between different interests which may otherwise be ‘averaged out’. At least some of the Red Team can be externals – where there are no commercial issues, they could even be the relevant interest groups themselves! – which is clearly likely to help avoid blind spots. Even in a brief exercise, it was clear that the role-playing approach could bring much greater richness to the output. The process is also iterative: the Blue Team present their outline plan (best not to develop too much detail early, as it is likely to change!); the Red Team make challenges back from their ‘interest’ perspectives; the Blue Team re-work the proposal to address as many of the issues as possible; further challenge, and so on. Clearly in a relatively brief review meeting, there will be very limited time for further analysis or data gathering between iterations, so the objective is not a finished plan, but the best possible framework to take away and work up, together with lists of actions and owners. That leads me to my final point: While a Red Team Review would normally be looking at a more-or-less finished proposal, the process we tested will add most value early in the process of development. No-one likes to make significant changes to a plan that they have put a lot of effort into, however important, and that may well lead to the smallest adaptation possible, rather than the best. Thanks WBMS and Quirk for organising a stimulating event!
I went to a fascinating talk by Adam Hoyle, Managing Director, Tradax Group Ltd, on Corporate Best Practice in Public Sector Bidding. I thought there were a number of lessons that apply more generally to running all kinds of projects that would be worth sharing.
Seven best practice tips
- Don’t start projects unless they align with your overall strategy
- Make sure you have thought through exactly what decision-making authority each person involved should have, and that this has been clearly communicated and understood
- Give everyone involved a clear written briefing pack at the start, providing them with all the basic information about the project that they will require
- Standardise what you can – but everything that is standardised needs an owner who takes their ownership seriously
- Think hard about what information would really make a difference to your performance if you had it, and work creatively (legally of course) to get it – for example using FoI requests
- Use the information you have intelligently – there is probably much more that you can learn than is immediately obvious, if you put it all together
- Transitions between teams – for example on winning a bid, or starting to operate an asset – are high-risk boundaries, which need careful planning to make sure they go smoothly
[caption id="" align="alignright" width="300"] Tyrannosaurus rex, Palais de la Découverte, Paris (Photo credit: Wikipedia)[/caption]
Evolution is the natural process by which all forms of life adapt to changes in their environment. It is a very slow process, in which many small changes gradually accumulate. It is unplanned and undirected: who knows how the environment may change in the future, and so what adaptations would put us ahead of the game? Successful changes are not necessarily the best possible choices, merely the best of those that were tested. Different individuals start from different places, and so the adaptations which seem to work will vary. Consequently, over time, divergence will occur until different species result, even though each species can be traced back to a common ancestor. But evolution is brutal too: not all species will make it. Some find they have gone down an evolutionary dead end, and some that change is simply too fast for them to adapt to.
Sometimes organisational change can be like this. I once worked for a public-sector organisation which was privatised, so that it had to change from being ‘mission-led’ to being profit-led. Management set out a vision for what it wanted the organisation to become – essentially a similar, unitary, organisation but in the private sector – but was unable to make the radical changes necessary to deliver it fast enough. Evolution carried on regardless as the primary need to survive forced short-term decisions which deviated from the vision. Without a unifying mission as a common guide, different parts of the organisation evolved in different ways to adapt to their own local environments. Fragmentation followed, with a variety of different destinies for the parts, and a few divisions falling by the wayside. Despite starting down their preferred route of unitary privatisation, the eventual destination was exactly what the original managers had been determined to avoid.
What is the lesson? Ideally of course it should be possible to set out a strategic objective, and then to deliver the changes needed to get there. But if the change required is too great, or the barriers mean change is brought about too slowly, the short-term decisions of evolution may shape the future without regard to management intentions. That does not necessarily make the outcome worse in the greater scheme of things: after all, evolution is about survival of the fittest. But natural selection is an overwhelming force, and if short-term decisions are threatening to de-rail management’s strategic plan, it may be wise to take another look at the plan, and to try to work with evolution rather than against it.
A few years ago I needed to hire an assistant. I’d fixed an interview, and everything was organised. It was five minutes before the time the candidate was due, and I was just collecting my papers and my thoughts. At that moment, the din of the fire alarm started up.
There is – of course – nothing that you can do. Down the concrete back stairs, and out round the back of the building to the assembly point, into the London drizzle without a coat, while I imagined my interviewee arriving at the front. I had left all my papers on my desk in the dry, and had no other record of his contact details, so I had no way to suggest an alternative plan.
A little while later, my mobile rang. Having arrived and been barred from entry, he had managed to track down my mobile number himself, and we were able to arrange to carry on with the interview while we dried out in a local coffee shop. Needless to say, his resourcefulness impressed me and he got the job. Despite the unhelpful circumstances of the interview, he was one of my best hires ever.
Life has a habit of not going the way we plan it. Unexpected circumstances can often be turned to our advantage though, if we grasp them rather than trying to stick to the plan, and often the results are better than you could possibly have expected.